2025 Reliable Study Materials & Testing Engine for CTS-D Exam Success!
Validate your Skills with Updated CTS-D Exam Questions & Answers and Test Engine
AVIXA CTS-D - Design Exam Syllabus Topics:
| Topic | Weight |
|---|---|
| Duty A: Conducting a Needs Assessment | 16.8% |
| Task 1: Identify Decision-makers and Stakeholders | 1.6% |
| Task 2: Identify Skill Level of End Users | 2.4% |
| Task 3: Educate AV Clients | 1.6% |
| Task 4: Review Client Technology Master Plan | 3.2% |
| Task 5: Identify Client Expectations | 4% |
| Task 6: Identify Scope of Work | 4% |
| Duty B:Coordinating with Other Professionals to Develop Project Documentation | 23.2% |
| Task 1: Review A/E (architectural and engineering) drawings | 4% |
| Task 2: Coordinate with architectural/interior design professionals | 4% |
| Task 3: Coordinate with Mechanical Professionals | 1.6% |
| Task 4: Coordinate with Structural Professionals | 1.6% |
| Task 5: Coordinate with Electrical Professionals | 3.2% |
| Task 6: Coordinate with lighting professionals | 2.4% |
| Task 7: Coordinate with IT and network security professionals | 4.0% |
| Task 8: Coordinate with acoustical professionals | 1.6% |
| Task 9: Coordinate with life safety and security professionals | 0.8% |
| Duty C: Developing AV Designs | 48% |
AVIXA CTS-D Exam Certification Details:
| MemberExam Price | $475(USD) |
| Duration | 180 mins |
| Sample Questions | AVIXA CTS-D Sample Questions |
| Passing Score | 350 / 500 |
| Schedule Exam | Pearson VUE |
| Exam Name | AVIXA Certified Technology Specialist - Design (CTS-D) |
NEW QUESTION # 49
What steps are required for the AV consultant to provide the program report?
Response:
- A. Budget, scope of work, major bill of materials
- B. Architectural requirements, display technologies, facility plan
- C. Space planning, security requirements, existing site conditions
- D. Facilities survey, end user interviews, project requirements
Answer: D
NEW QUESTION # 50
Which of the following is a common method for controlling ambient noise in AV system design?
- A. Positioning microphones closer to noise sources
- B. Using acoustic treatment materials
- C. Adding more speakers
- D. Increasing the amplifier gain
Answer: B
NEW QUESTION # 51
What is the first design reference you need to consider in your design consultation?
Response:
- A. Regulatory requirements
- B. Manufacturer documentation
- C. Project documentation
- D. Client's standards and best practices
Answer: A
NEW QUESTION # 52
Which component in an AV system is responsible for controlling multiple devices like projectors, screens, and lighting?
- A. Control system processor
- B. Switcher
- C. DSP
- D. Amplifier
Answer: A
NEW QUESTION # 53
What is the primary goal of a needs assessment?
Response:
- A. Identifying the intended use of a space
- B. Selecting the right equipment
- C. Meeting the budget requirements
- D. Establishing the "first use" date
Answer: A
NEW QUESTION # 54
What does "scalability" mean in the context of AV system design?
- A. The system's ability to increase in size or capacity without major redesign
- B. The aesthetic appeal of the system
- C. The system's initial cost effectiveness
- D. The ease of installation
Answer: A
NEW QUESTION # 55
Which of the following amplifiers would you specify for a 30 ft x 40 ft conference room with a 10 ftceiling. The requirements are to provide a system with two front speakers, and two zones of ceiling speakers?
Response:
- A. 4 Channel 300 W/Ch @ 8 Ohm
- B. 4 Channel 300 W/ch @ 70V or 4 Ohm
- C. 4 Channel 100W/Ch @ 4 Ohm
- D. 2 Channel 300 W/Ch @ 70V or 8 Ohm
Answer: B
NEW QUESTION # 56
Which of the following best describes "project commissioning" in AV projects?
- A. Training end users
- B. System design
- C. Installation of AV equipment
- D. Testing and verification of system performance before handover
Answer: D
NEW QUESTION # 57
Benchmarking is a process by which AV designers and clients:
Response:
- A. Compare expected results to actual results
- B. Evaluate the performance of AV systems
- C. Examine the AV designs of other facilities
- D. List specifications required on AV equipment
Answer: C
NEW QUESTION # 58
During the program phases, interviews with the end user or owner's representatives are beneficial in order to:
Response:
- A. Understand how to interface with the life safety systems.
- B. Coordinate IP device addressing and VLAN considerations.
- C. Gain an overview of their vision and how they will use the system.
- D. Review the current system design and functional diagrams.
Answer: C
NEW QUESTION # 59
When installing conduit, it is important to remember that the conduit will require:
Response:
- A. Adequate mounting support to withstand cable pulling
- B. Room to expand 45 percent because of latent heating
- C. Internal insulation, usually an injected polyurethane jell
- D. A slip sleeve to ensure adequate air space for cable
Answer: A
NEW QUESTION # 60
The two basic AV signal types are:
Response:
- A. Digital and Analog
- B. Bit and Megabyte
- C. Dynamic and Static
- D. Sine and Cosine
Answer: A
NEW QUESTION # 61
Which of these AV equipment types is most commonly used for switching multiple video inputs to multiple outputs?
- A. Matrix switcher
- B. Audio mixer
- C. DSP
- D. Amplifier
Answer: A
NEW QUESTION # 62
For branch circuit loads, you should not plan to use more than __________ of the available current.
Response:
- A. 50 percent
- B. 80 percent
- C. 60 percent
- D. 75 percent
Answer: B
NEW QUESTION # 63
What is the primary purpose of a "block diagram" in AV design?
- A. To specify budget details
- B. To define user roles
- C. To show high-level signal flow and system components
- D. To detail cable terminations
Answer: C
NEW QUESTION # 64
Where would the person in charge of verifying system performance locate performance criteria?
Response:
- A. The commissioning report
- B. The project specifications
- C. The owner's manuals
- D. The original installers of the system
Answer: B
NEW QUESTION # 65
The total length of a measurement from a U.S. customary scaled drawing of 1/8 inch is 3.5 inches. What is the length of the real object?
Response:
- A. 25 feet
- B. 28 feet
- C. 35 feet
- D. 18 feet
Answer: B
NEW QUESTION # 66
Which of the following signals can coexist in one conduit without interference?
[Developing AV Designs/Create draft AV design]
Response:
- A. Speaker level audio and serial control
- B. Data network and line-level audio
- C. Video and microphone-level audio
- D. Serial control and video
Answer: D
NEW QUESTION # 67
Which microphone pickup pattern is most sensitive to sound from all directions?
- A. Bi-directional
- B. Cardioid
- C. Omnidirectional
- D. Hypercardioid
Answer: C
NEW QUESTION # 68
A meeting room requiring speech reinforcement has an ambient SPL reading of 76 dB. What action should be taken:
Response:
- A. Designer shall ensure the sound system can achieve 85 dB sound output.
- B. Designer shall notify the client that the ambient noise level will be acceptable with the proper design.
- C. Designer shall ensure the sound system can achieve 91 dB sound output.
- D. Designer shall notify client that the ambient noise will prevent the system from achieving an acceptable loudness level.
Answer: D
NEW QUESTION # 69
In AV design, what is the primary advantage of using fiber optic cables over copper?
- A. Immunity to electromagnetic interference and longer transmission distances
- B. Lower cost
- C. Easier termination
- D. Higher weight
Answer: A
NEW QUESTION # 70
......
Regular Free Updates CTS-D Dumps Real Exam Questions Test Engine: https://skillmeup.examprepaway.com/AVIXA/braindumps.CTS-D.ete.file.html